RFQ Checklist
- 2D/3D drawing, material target, magnetic pattern, and sensing datum
- Operating temperature, vibration, media exposure, and lifetime requirement
- Sample quantity, tooling target, annual forecast, destination, and PPAP needs
- Current failure mode (if replacing sintered), vibration profile, and drop-test requirements


